For my 'landscaping' project it just remains for me to lay the slabs. Unfortunately, when I started this 2 week project (1 1/2 years ago!) I excavated just a little too much (the area was originally sloped). Apart from building retaining walls, steps etc I've laid 1 ton(ne?) of MOT and walked about on it but it leaves a bit more than 50 mm for the sand/cement drymix. I don't really want to buy another ton and be left with, say 60%, and I can't find anyone supplying less than a ton.
3 questions if I may:-
1) is walking about for a few weeks enough, or do I need to compact it eg with the end of a sledge hammer
2) some areas have predominantly larger stuff, bits of bricks etc that I've smashed, do I need to infill with grit sand or gravel?
3) how much more than 50mm of sand/cement can I use?
Many thanks, again, Chris
Whats the max depth for 10:1 sand/cement
-
- Site Admin
- Posts: 417
- Joined: Wed Apr 11, 2007 11:53 am
- Location: East Riding
50cm ?? Half a metre? Of cement/sand?
Sounds like a lot - I was told that it's cheaper to use type 1 to make up the depth than it is to use concrete...
And from what I've read on this site, I doubt whether walking on the type1 will be enoug - not unless you weigh over a tonne
The professionals will be able to confirm/refute ...
Sounds like a lot - I was told that it's cheaper to use type 1 to make up the depth than it is to use concrete...
And from what I've read on this site, I doubt whether walking on the type1 will be enoug - not unless you weigh over a tonne
The professionals will be able to confirm/refute ...
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
you can buy 25-40 kg bags of type 1 at most garden centres and builders merchants
you need too try and compact it it,even if you use a sledge hammer and a 1m length of 4 by 2
occasionally i would increase bedding material to up to 100mm but this is only rarely and for a specific reason
30-50 mm is optimun
cheers LLL
you need too try and compact it it,even if you use a sledge hammer and a 1m length of 4 by 2
occasionally i would increase bedding material to up to 100mm but this is only rarely and for a specific reason
30-50 mm is optimun
cheers LLL
-
- Posts: 11
- Joined: Mon Apr 03, 2006 8:50 pm
- Location: brighton
Thanks LLL (you've advised me before)
It's not a huge area so a sledgehammer + wood it is.
But re a smaller quantity of type 1 MOT, all my local blders merchants (BuildCentre, Travis P, Covers, Jewson) only offer a min size of a 1 ton bulk bag. I hadn't thought about a garden centre, I'll visit one tomorrow. But if anyone has any leftovers in the Brighton area...
It's not a huge area so a sledgehammer + wood it is.
But re a smaller quantity of type 1 MOT, all my local blders merchants (BuildCentre, Travis P, Covers, Jewson) only offer a min size of a 1 ton bulk bag. I hadn't thought about a garden centre, I'll visit one tomorrow. But if anyone has any leftovers in the Brighton area...
C.D.
-