Posted: Mon Jun 25, 2007 11:39 am
I just laid a sanstone circle -Mint fossile with two rows of Raj Green sets (blocks) around it, and I gota say what a great help this site is. I out in the 100 mm of foundation of scalpings then laid the slabs on a full motar bed of about 50mm+ trouble is this weather meant I couldnt grout it straight away.
I planned to use soft sand and some dye (liquid - Soverign chemicals Redtex) but after reading some more I wondered how best to do it and if I got the right dye, maybe I would be better off with one of these new ready mixed grouts?
A second problem which I hope isn't a disaster is I have found 3 of the slabs are loose, no one has really walked on them but I must have when laying the sets (I did cover it with a board) will the grout hold them together? the gaps are roughly 20mm with 25-35 mm depth
Thanks in advance for any tips..
I planned to use soft sand and some dye (liquid - Soverign chemicals Redtex) but after reading some more I wondered how best to do it and if I got the right dye, maybe I would be better off with one of these new ready mixed grouts?
A second problem which I hope isn't a disaster is I have found 3 of the slabs are loose, no one has really walked on them but I must have when laying the sets (I did cover it with a board) will the grout hold them together? the gaps are roughly 20mm with 25-35 mm depth
Thanks in advance for any tips..