Posted: Tue Jul 17, 2007 9:05 am
Hi,
I have just started laying pre-cast concrete riven slabs for a patio.
I am using a 35-50mm 10-1 dry mix - each bed being individually made for each slab as the thickness is variable. Each slab being consolidated with a mallet. I pointed the slabs in within 3-4 hours of being laid. A few days later I notice that a couple of slabs are slightly loose - just enough to crack the pointing around the joint with the slab.
I'm obviously doing something wrong - any ideas or advice would be appreciated to prevent remainder of patio suffering a similar fault and to correct the current slabs.
Thanks in advance,
Stew
I have just started laying pre-cast concrete riven slabs for a patio.
I am using a 35-50mm 10-1 dry mix - each bed being individually made for each slab as the thickness is variable. Each slab being consolidated with a mallet. I pointed the slabs in within 3-4 hours of being laid. A few days later I notice that a couple of slabs are slightly loose - just enough to crack the pointing around the joint with the slab.
I'm obviously doing something wrong - any ideas or advice would be appreciated to prevent remainder of patio suffering a similar fault and to correct the current slabs.
Thanks in advance,
Stew