Posted: Sat May 05, 2007 10:45 am
Hello
I am extending an existing patio just by about 1.5m sq to put a kids plastic playhouse on. I have used a base of just concreting sand, on top of a plastic sheet becsue it doesn't need to be too strong. My question is do I need to wet the area once the slabs are laid or will it just bake hard?
thanks
I am extending an existing patio just by about 1.5m sq to put a kids plastic playhouse on. I have used a base of just concreting sand, on top of a plastic sheet becsue it doesn't need to be too strong. My question is do I need to wet the area once the slabs are laid or will it just bake hard?
thanks