Page 1 of 1

Posted: Sun Oct 22, 2006 10:03 pm
by benski662
one thing i have a problem with and forget to get advice on is
i am about 2 inches low on my compacted mot in one area which is about 5m2
i have some mot over can i just lay this on top of the already compacted mot and wack it down to the correct level or just make it up with the mortar mix when i lay the slabs in that area
cheers
Craig

Posted: Sun Oct 22, 2006 10:50 pm
by andpartington
best plan is to add the mot and wack it
but u can make it up with the beding mix
when u wack it be sure not to vibrate what u ahve allredy done too much
andy