Posted: Wed May 10, 2006 1:29 am
Hello from a newbie. Great site! Will come in very useful when I get round to doing patio, however for now .....
I have a kitchen floor which is currently flags on soil. I want to lay quarry tiles (6" x 6" x 1/2") and am planning on doing this on concrete (4") over dpm. I am wondering if it will be possible to lay the tiles straight onto the concrete when laid rather than wait months for it to dry out and use tile adhesive etc. Is this OK to do and if so how long should I wait to a) walk on the floor, b)grout the tiles. What can I grout the tiles with if done this way. Can I use cement base tile grout or do I need to use mortar. I just thought this way might enable me to get kitchen back in use a bit quicker.
Any advice would be greatly received.
thanks, from bash it
I have a kitchen floor which is currently flags on soil. I want to lay quarry tiles (6" x 6" x 1/2") and am planning on doing this on concrete (4") over dpm. I am wondering if it will be possible to lay the tiles straight onto the concrete when laid rather than wait months for it to dry out and use tile adhesive etc. Is this OK to do and if so how long should I wait to a) walk on the floor, b)grout the tiles. What can I grout the tiles with if done this way. Can I use cement base tile grout or do I need to use mortar. I just thought this way might enable me to get kitchen back in use a bit quicker.
Any advice would be greatly received.
thanks, from bash it