Posted: Sun Oct 30, 2005 11:19 am
Nuff said about what a great site this is.
I have over the last week laid approx 19 sq mts of Eclipse paving (which I must say looks very good). I have around 2 mts to complete but due to the adverse weather conditions will have to delay until next week end.
1) I laid them on a full bed of 15:2 sharp sand / cement on a semi dry bed approx 60mm depth.
2) will the area be in danger with out pointing for a week or 2
I have covererd the last area to be laid with boarding.
Has any one got experience of the "Easipoint" system used for pointing ?
I have over the last week laid approx 19 sq mts of Eclipse paving (which I must say looks very good). I have around 2 mts to complete but due to the adverse weather conditions will have to delay until next week end.
1) I laid them on a full bed of 15:2 sharp sand / cement on a semi dry bed approx 60mm depth.
2) will the area be in danger with out pointing for a week or 2
I have covererd the last area to be laid with boarding.
Has any one got experience of the "Easipoint" system used for pointing ?