Posted: Thu Sep 22, 2005 4:01 pm
Hi
I have a professionally laid driveway sub-base which is topped with gravel.
I have decided to lay 2 runs of 3 by 2 "council slabs" from the street to the garage, a total of 48 slabs.
I will be very grateful if someone can tell me what is the best way to bed them down. Initially I was thinking of a dry mix or just sand, but as the runs will be only one slab wide I guess that sand will be pushed out !.
Any advise will be appreciated.