Posted: Fri Apr 02, 2004 4:19 pm
hi,
this weekend i will be laying my new patio :D
ive dug down about 4 inch and thats about as far is as is possibe due to the very compacted builders rubble.
im not going to lay a sub base as the ground is so hard it would make no difference as far as i can tell.
the patio dimensions are 3.6m x 3.6m (12' x 12'),
im using (64) 450x450x32mm slabs to form a square, (8x8 slabs)
(2 tons of sharp sand and 5x 25kg bags of cement,)
now is the best method, screed bedding then Dry grouting the whole patio?
this weekend i will be laying my new patio :D
ive dug down about 4 inch and thats about as far is as is possibe due to the very compacted builders rubble.
im not going to lay a sub base as the ground is so hard it would make no difference as far as i can tell.
the patio dimensions are 3.6m x 3.6m (12' x 12'),
im using (64) 450x450x32mm slabs to form a square, (8x8 slabs)
(2 tons of sharp sand and 5x 25kg bags of cement,)
now is the best method, screed bedding then Dry grouting the whole patio?