Posted: Sun Mar 14, 2004 3:08 pm
Tony,
Just want to run this past you to confirm I've got things right:
I'll soon be laying a patio with slabs where the garden is quite sloped (slopes up from the conservatory). I'm going to step the patio so that it's on two levels.
I plan to lay the lower level without a sub-base on a wet mix (6 sharp sand to 1 cement). I'll be using either bricks or railway sleepers as risers laid on a concrete bed and filled in behind with a dry mix (10 parts ballast to 1 cement). There may be two steps up to the second level or there may be just one step. I plan to lay the second level again without a sub-base on a wet mix.
Does this sound about right?
Regards
Gary
Just want to run this past you to confirm I've got things right:
I'll soon be laying a patio with slabs where the garden is quite sloped (slopes up from the conservatory). I'm going to step the patio so that it's on two levels.
I plan to lay the lower level without a sub-base on a wet mix (6 sharp sand to 1 cement). I'll be using either bricks or railway sleepers as risers laid on a concrete bed and filled in behind with a dry mix (10 parts ballast to 1 cement). There may be two steps up to the second level or there may be just one step. I plan to lay the second level again without a sub-base on a wet mix.
Does this sound about right?
Regards
Gary