Page 1 of 1

Posted: Wed Jun 30, 2004 11:24 am
by 115-1093880872
How do you calculate quantities required with regards Base Course rolled depth 50mm and Wearing Course rolled depth 25mm

Posted: Wed Jun 30, 2004 12:16 pm
by danensis
Multiply the width by the length by the depth. This gives the volume in cubic metres.

Posted: Wed Jun 30, 2004 2:04 pm
by 115-1093880872
Is there a conversion from volume to weight.......what coverage (sq meters) would i get for one tonne of Tarmac rolled to a depth of 50mm(base course) and 25mm(wearing course)

Posted: Wed Jun 30, 2004 3:32 pm
by 84-1093879891
This information is given on the main website. See the Laying Bitmac page