great site, i have the grand task of laying 300 marshalls timber decking flags (i.e. wood effect) over an area of 68 sq m. i have had a couple of guys come and give me quotes for the job and a price was agreed. all the materials were ordered and they were meant to start last weekend. they arrived on time and dropped off their tools etc, i even hired a compactor for the job. they told me that they had another job and would return on sunday. sunday came and went. i rang them to be told that one of them had injured his back on the other job. so not only did i order all the materials for the job and hire a compactor i have now been let down. i am trying to find someone else to quote me but failing that i will attempt the job myself.
as i was saying before i got carried away.. the area is 68sqm which is a soil base. this area is at the end of my lawn and is elevated 2 ft above the lawn. at either side of this area is fence panelling and at the back of the area is a brick wall. the flags are 450mmx450mm.
questions :
A / i have order 5 tonnes of sand grit for the base, is this all i will need to apply to the surface before i compact ?
B / when laying the flags what mixture will i need for the mortar and how do you measure the correct amount. i have read 5:1 sand/cement mixture but how do you measure the amount to be used.
C/ will i need to build some sort of retention wall around the perimeter area to support the flags? instead of a wall can i use railway sleepers?
i hope my questions make sense and any help is appreciated.
abs
as i was saying before i got carried away.. the area is 68sqm which is a soil base. this area is at the end of my lawn and is elevated 2 ft above the lawn. at either side of this area is fence panelling and at the back of the area is a brick wall. the flags are 450mmx450mm.
questions :
A / i have order 5 tonnes of sand grit for the base, is this all i will need to apply to the surface before i compact ?
B / when laying the flags what mixture will i need for the mortar and how do you measure the correct amount. i have read 5:1 sand/cement mixture but how do you measure the amount to be used.
C/ will i need to build some sort of retention wall around the perimeter area to support the flags? instead of a wall can i use railway sleepers?
i hope my questions make sense and any help is appreciated.