Posted: Thu May 23, 2002 7:48 am
Hi Tony
I am designing a patio which leads down to grass level via two steps. I am planning on using a 9 size millstone random pattern on the patio and then various 620mm deep sizes for the treads of the steps. My contractor would prefer to start at grass level and build the steps up first laying the bricks we have chosen as risers on top of the lower tread. (as opposed to laying the all the risers and then butting each tread flag up to the riser at the rear of the tread - with the appropriate joint). Would you have any prefered method?
Also the contractor's method necesitates a 'step' at grass level on to which he would lay his first riser. I have no problem with this as it means keeping the grass neat at the start of the steps is much easier. My plan was to use the smallest 'depth' for this step ie 310mm. Again - any thoughts based on your experience of what works and what does not?
I am designing a patio which leads down to grass level via two steps. I am planning on using a 9 size millstone random pattern on the patio and then various 620mm deep sizes for the treads of the steps. My contractor would prefer to start at grass level and build the steps up first laying the bricks we have chosen as risers on top of the lower tread. (as opposed to laying the all the risers and then butting each tread flag up to the riser at the rear of the tread - with the appropriate joint). Would you have any prefered method?
Also the contractor's method necesitates a 'step' at grass level on to which he would lay his first riser. I have no problem with this as it means keeping the grass neat at the start of the steps is much easier. My plan was to use the smallest 'depth' for this step ie 310mm. Again - any thoughts based on your experience of what works and what does not?