Page 1 of 1
Posted: Mon Sep 23, 2019 7:45 pm
by Nickling
Hi all.
I’m just calculating how much 6mm shingle I should use when tar and chipping a driveway. I’ll be using Colas Loechip bitumen emulsion. I reckon about 1ton of shingle per 50m2
Any advise would be appreciated.
Thanks in advance
Posted: Tue Sep 24, 2019 10:16 am
by Tony McC
There are all sorts of factors affecting the rates of coverage for both the binder and the aggregate used in surface dressing and it's a skill that really does require an experienced team with all the right equipment.
For most Surface Dressing teams, the season is now all but over - the end of September is widely accepted as the last date for acceptable conditions to ensure a fairly reasonable result. I'd be very inclined, given the weather outside right now, to leave such a project until next Spring.
With a single size 6mm aggregate (S6) and assuming a single spread technique, a professional team should achieve 90-120 m² per tonne, but that's based on effective sweping and re-use with minimal surplus cover.