Cut & fill
Posted: Sat Feb 24, 2024 4:01 pm
Hi All,
I have a 300m2 area to cut & fill. Can I use the excavated topsoil to bring up the lower level if i compact with a sheep’s foot roller? Will this compact with no future settlement?
I Then plan to put 150mm of type one on top.
Thank you
James
I have a 300m2 area to cut & fill. Can I use the excavated topsoil to bring up the lower level if i compact with a sheep’s foot roller? Will this compact with no future settlement?
I Then plan to put 150mm of type one on top.
Thank you
James