New patio DIY
Posted: Sat Jun 05, 2021 9:36 am
Hi first time posting in years, doing a patio approx 7 x 4m.
New build property by Persimmon, existing patio finished level was bang on dpc, so now I have dug out, installed approx 5 ton of mot, whacked and my finished sub base level is still 110mm below my finished surface height which is 2 bricks below dpc.
I'm guessing this is still to much and need to put more mot in to build up?
Also is sloping towards the house ok if there's place to run off down the side of the house? Thank you.
New build property by Persimmon, existing patio finished level was bang on dpc, so now I have dug out, installed approx 5 ton of mot, whacked and my finished sub base level is still 110mm below my finished surface height which is 2 bricks below dpc.
I'm guessing this is still to much and need to put more mot in to build up?
Also is sloping towards the house ok if there's place to run off down the side of the house? Thank you.