Pricing a job to break out 100m2 of 6 inch reinforced concrete, standard door way access. About 32 tons to come out. So anyone with a micro done a big job how did it perform, I know there a massive difference between or 1.5 ton breaker and 3 ton so is the micro better than beaver pack and vibration white finger?
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

haggistini
Posts: 1405
Joined: Thu Sep 27, 2007 10:29 am
Location: South Wales
Contact:

Post: # 69504Post haggistini

I'm surprised you haven't got one for you tooth brush Giles.. :laugh:
http://www.G-Tech.co
Bespoke Paving Contractor
M:07944036174

Less yap yap more tap tap!

local patios and driveway
Posts: 1568
Joined: Mon May 10, 2010 9:58 pm
Location: Gatwick
Contact:

Post: # 69505Post local patios and driveway

Its a lot for a power pack by hand, but for my money i would go in with the pecker but make sure its a hire machine, they rattle those small machines to bits. No issue with fumes or have they spec'd exhaust flue?

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 69506Post dig dug dan

No issue with fumes or have they spec'd exhaust flue?


i don't think its inside,its just a doorway access (i think?)

never used one on a micro, but i gather its more powerful than a beaver.
My beaver has an 8hp petrol engine, the micro has a 10hp diesel so surely it has to be?

Pity you can't get a ripper tooth too. very handy once youv'e cracked the slab for yanking!
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 69509Post lutonlagerlout

2 lads with a compressor and jack hammers would do that in a week ,the rebar would be the biggest ballbreaker
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

DNgroundworks
Posts: 1951
Joined: Sat Dec 06, 2008 10:28 pm
Location: Preston, Lancashire

Post: # 69510Post DNgroundworks

Ive just done a 60m driveway with a micro and breaker, performed very well, managed to break and drag out in a few days. The same machine as DDD btw

haggistini
Posts: 1405
Joined: Thu Sep 27, 2007 10:29 am
Location: South Wales
Contact:

Post: # 69512Post haggistini

Luton your brutal.. But right! if you can get a machine in there I would.
http://www.G-Tech.co
Bespoke Paving Contractor
M:07944036174

Less yap yap more tap tap!

Mikey_C
Posts: 952
Joined: Mon Oct 30, 2006 8:24 pm
Location: Bournemouth, Dorset

Post: # 69515Post Mikey_C

is it worth cutting it up before ripping it out, you've only got to go deep enough to cut the rebar? as mr lout points out that is the ballbreaker

rab1
Posts: 1869
Joined: Sun Jun 07, 2009 10:19 pm
Location: scotland

Post: # 69520Post rab1

mate does demo work, k1250 in a trolly with correct blade and small machine doing the graft. :O
God loves a tryer

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 69533Post GB_Groundworks

weve got a 150mm cut floor saw on a 320mm blade so slicing it up isnt a problem its inside but i was planning on using our 2 big fans to blow and suck (oh er)

id like to get our 1.5 ton in with our krupp breaker as its a beast, but its looking like a hire jcb 0.8 and breaker or compressor and a few days hard work...

ive priced it so if we get it i'll figure it out as we go, thinking compressor might be the way to go, oh my back...

dan on a drive why use a micro not a mini etc?
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

Pablo
Posts: 1990
Joined: Sun Mar 25, 2007 10:49 pm
Location: N/Ireland

Post: # 69547Post Pablo

I've done about 80m with a micro but it was a 100mm reinforced pad. It was an old yard that then had a wall built around it so access was bad. Had a 1 ton tracked skip loader on it to which was hand loaded with the large bits as I worked away at the slab then used the digger to tidy the rest up. Took 1.5 days but I'd at least double that for yours and cutting it into 1m strips would make a huge difference. The machine coped well with it but you couldn't be greedy with the amout you were trying to break they do have a lot more power than a jackhammer though. Those JCB's are truely awful they have decent power but the controls are totally unergonomic and oversensitive and the plastic bodywork breaks if you have a decent fart on it.
Can't see it from my house

DNgroundworks
Posts: 1951
Joined: Sat Dec 06, 2008 10:28 pm
Location: Preston, Lancashire

Post: # 69562Post DNgroundworks

Simple reason giles, the 1.5t and the 3t kubotas that we hire are nearly new, and the little micro is an old dog, plus hes only got a breaker that fits the micro, that said they are pretty powerful.

Carberry
Posts: 1366
Joined: Fri Apr 15, 2011 9:05 pm
Location: Edinburgh

Post: # 69572Post Carberry

Just get a sledgehammer and lose a spare tyre or 8 :p