first post so be gentle.
when laying slabs is it best to use string lines set for levels, pieces of straight timber to level off or is it always a mixture of both . having fun with a largish patio at the mo but the marshalls slabs each have a camber on the top face which can give a false reading for level. thoughts please?
regards
String and fings - Levelling of slabs
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
Both, lots of string lines for level and layout and straight edges and timbers also
See main site lots of info on there
See main site lots of info on there
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com