Posted: Tue Aug 04, 2020 7:37 pm
by DIY Tom
Hi. I apologise now. I know this topic is heavily covered on the edging pages of the website and on the YouTube channel... I've read, re-read, watched, re-watched... but would like to make certain that I've understood properly.

I'm laying an unbound block paved driveway and wanted to confirm the process for laying the edge course / kerbs. I think the confusion for me was whether or not I am supposed to have two mixes - one for bed and one for haunch.

I think this is right:

1. Set up a string line so I can keep the level/laying course accurate.
2. Prepare a semi-dry mix of C7.5 (6 gravel, 3 grit sand, 1 cement).
3. Lay a 100-150mm bed of C7.5.
4. Trample with boot.
5. Add more C7.5 up to about 25mm proud of string line.
6. Lay blocks along the bed/line.
7. Haunch with C20 (4 gravel, 2 sand, 1 cement) at 25-50mm slump.

Can someone confirm or set me straight?!

Cheers!

Posted: Tue Aug 25, 2020 6:00 pm
by Tony McC
Spot on!

Posted: Tue Aug 25, 2020 6:10 pm
by Tony McC
Apologies for being late to this - had all sorts of health issues with angina during the heatwave and now an arthritic knee that is driving me mad with pain.


I'd put in a complaint to Trading Strandards.

The only way we will be able to stop these traders supplying complete dross as an alleged quality aggregate is if a few of them are hauled up and prosecuted. Word will soon get around and the more clued-up amongst them will sort themselves out sharpish.

I *know* it's happening - on almost 75% of the assessments I've done in the past 2 years, the sub-base has been "AOC" - Any Old Crap. Supplied to the homeowner as Type 1 or the nebulous "hardcore" but it's nothing more than crap. Sad to say, contractors are not blameless in all this - many of them know it's most definitely not a Type 1, but they go along with it because its cheap and its buried and out-of-sight, and what's the chance of the homeowner knowing any better? And then it starts to move or sink, the jointing cracks, the flags copme loose, and that's when I get called in.

When ever I preapare a CPR35 report for a court and this sort of sharp practioce is identified, I *always* include a paragraph in the report to the effect that the homeowner has been defrauded and that both the contractor and aggregate supplier should be made to answer to the court.