Posted: Tue Aug 04, 2020 7:37 pm
Hi. I apologise now. I know this topic is heavily covered on the edging pages of the website and on the YouTube channel... I've read, re-read, watched, re-watched... but would like to make certain that I've understood properly.
I'm laying an unbound block paved driveway and wanted to confirm the process for laying the edge course / kerbs. I think the confusion for me was whether or not I am supposed to have two mixes - one for bed and one for haunch.
I think this is right:
1. Set up a string line so I can keep the level/laying course accurate.
2. Prepare a semi-dry mix of C7.5 (6 gravel, 3 grit sand, 1 cement).
3. Lay a 100-150mm bed of C7.5.
4. Trample with boot.
5. Add more C7.5 up to about 25mm proud of string line.
6. Lay blocks along the bed/line.
7. Haunch with C20 (4 gravel, 2 sand, 1 cement) at 25-50mm slump.
Can someone confirm or set me straight?!
Cheers!
I'm laying an unbound block paved driveway and wanted to confirm the process for laying the edge course / kerbs. I think the confusion for me was whether or not I am supposed to have two mixes - one for bed and one for haunch.
I think this is right:
1. Set up a string line so I can keep the level/laying course accurate.
2. Prepare a semi-dry mix of C7.5 (6 gravel, 3 grit sand, 1 cement).
3. Lay a 100-150mm bed of C7.5.
4. Trample with boot.
5. Add more C7.5 up to about 25mm proud of string line.
6. Lay blocks along the bed/line.
7. Haunch with C20 (4 gravel, 2 sand, 1 cement) at 25-50mm slump.
Can someone confirm or set me straight?!
Cheers!