Posted: Sat Aug 12, 2017 8:31 pm
Hi - long time reader but first poster. Fantastic site Tony, so helpful.
I'm looking for a little advice about installing high kerbs like these
I have a number of curves to follow so the plan is to have about a 6mm joint in between each block so I have more flexibility around the arcs.
What I'm not sure about is what's best when it comes to filling the joints. I want to colour match (charcoal). Do I mortar in between the blocks as I lay them then point them after or do I leave them dry until the hunching is set then grout them? If so, how do you ensure the whole joint is filled?
Thanks for any help
I'm looking for a little advice about installing high kerbs like these
I have a number of curves to follow so the plan is to have about a 6mm joint in between each block so I have more flexibility around the arcs.
What I'm not sure about is what's best when it comes to filling the joints. I want to colour match (charcoal). Do I mortar in between the blocks as I lay them then point them after or do I leave them dry until the hunching is set then grout them? If so, how do you ensure the whole joint is filled?
Thanks for any help