Hi all.
I have read about sub bases and was just wondering?
I am doing a drive and I have dug down 40 cm. I want to put bricks down first (frog up) then i want to put a sub base down with a depth of 10cm. which will be wracked down.
Then i want to put a membrane down then another layer of sub base down this lawyer is to be 17.5 cm before putting sand on the top apart from over kill would there be any other issues.
The bricks that i have put down are side by side in squires)
Please respond
I have read about sub bases and was just wondering?
I am doing a drive and I have dug down 40 cm. I want to put bricks down first (frog up) then i want to put a sub base down with a depth of 10cm. which will be wracked down.
Then i want to put a membrane down then another layer of sub base down this lawyer is to be 17.5 cm before putting sand on the top apart from over kill would there be any other issues.
The bricks that i have put down are side by side in squires)
Please respond