Posted: Fri Aug 19, 2016 9:33 am
Hi
We have recently built an end to end patio using natural sandstone where the patio edge touches the house wall.
There is no drain or gravels between the patio slabs and the wall.
The patio is 2 bricks below the DPC level.
The patio is roughly 3 m wide and is followed by a lawn which is 6 m wide.
I have started seeing little water logging in the sand fill between the slab and house wall.
The contractors are still on site and I want to know whether this can be a problem long term.
Should we ask the contractors to make any changes to the edge?
Thanks.
We have recently built an end to end patio using natural sandstone where the patio edge touches the house wall.
There is no drain or gravels between the patio slabs and the wall.
The patio is 2 bricks below the DPC level.
The patio is roughly 3 m wide and is followed by a lawn which is 6 m wide.
I have started seeing little water logging in the sand fill between the slab and house wall.
The contractors are still on site and I want to know whether this can be a problem long term.
Should we ask the contractors to make any changes to the edge?