My contractor seems to think we only need to wait two weeks before applying a sealer (we are thinking about using resiblock). This would be great as the weather should still be dry enough to apply the sealant.

Is it preferable to apply the sealant a few weeks after the blocks have been laid and the weather is good or wait 8 weeks and apply the sealant when the weather may be an issue?

Posted: Thu Aug 18, 2016 9:45 am
by ResiblockBoss
Hi Charlie
The short answer is - you do need to wait the 8 weeks
Craig