Its a great perk of the job when you are excavating and find that there is a good quality, good depth of sub base under the drive.
When we price we always include for digging down to minimum 250mm and then minimum 160mm of type 1.
So finding a good sub base already there means less spoil away and less stone in. This equals very happy contractor
I always dig down and check the depth and quality. If sub base is only75-100mm thick, we scrape off, store to one side, excavate and then in-fill with the reclaimed sub base
Occasionaly, you get the client asking for some money knocked off because we haven't dug out as much as the quote said. My reply is - would you be willing to pay more if I had to dig deeper, have more waste and in-fill with more sub base. Their answer is always NO.
Its swings and roundabouts. Some jobs cost you a little more when you have to dig out an extra 20 ton of waste and in-fill with an extra 20 ton of type 1 and some jobs you make a bit more money on when you find a good base.
I know which one I prefer
When we price we always include for digging down to minimum 250mm and then minimum 160mm of type 1.
So finding a good sub base already there means less spoil away and less stone in. This equals very happy contractor
I always dig down and check the depth and quality. If sub base is only75-100mm thick, we scrape off, store to one side, excavate and then in-fill with the reclaimed sub base
Occasionaly, you get the client asking for some money knocked off because we haven't dug out as much as the quote said. My reply is - would you be willing to pay more if I had to dig deeper, have more waste and in-fill with more sub base. Their answer is always NO.
Its swings and roundabouts. Some jobs cost you a little more when you have to dig out an extra 20 ton of waste and in-fill with an extra 20 ton of type 1 and some jobs you make a bit more money on when you find a good base.
I know which one I prefer
-
- Posts: 2504
- Joined: Thu Jul 10, 2003 10:20 pm
- Location: hemel hempstead,herts. 01442 212315
ccasionaly, you get the client asking for some money knocked off because we haven't dug out as much as the quote said. My reply is - would you be willing to pay more if I had to dig deeper, have more waste and in-fill with more sub base. Their answer is always NO.
Its swings and roundabouts. Some jobs cost you a little more when you have to dig out an extra 20 ton of waste and in-fill with an extra 20 ton of type 1 and some jobs you make a bit more money on when you find a good base.
I know which one I prefer
had the same thing when i only need two grab loads out instead of four, and the customer expected a £500 rebate.
I have stopped itemising things now as i have even had someone count the number of gravel boards i used on a fence and knocked one off the bill as it was one less than quoted
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Indeed, be wary how much you detail on your quotations.........you can end up stitching yourself up unwittingly.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Posts: 2
- Joined: Thu Apr 17, 2014 6:56 am
- Location: edinburgh
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
Unless they supply a detailed spec.I put very little spec on apart from liner m for fences or pipe lines m2 for patio driveway, that way they have little to ask for rebate, MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Posts: 791
- Joined: Wed Feb 05, 2014 7:50 pm
- Location: leicester
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
My response to this was usually that, while I could credit them for the reduced excavation and sub-base supply, but then I'd have to increase the rate per cubic metre or tonne because I was dealing with much smaller quantities and couldn't achieve the same keen prices due to economies of scale.Nigel Walker wrote:Occasionaly, you get the client asking for some money knocked off because we haven't dug out as much as the quote said
If we could avoid any sub-base work whatsoever, so not even any regulating, I would credit them a small amount, never, IIRC, more than 50%, but if I had to get involved in re-profiling, regulating or replacing sections where drainage had been installed, then that would be charged as an EO
Site Agent - Pavingexpert