Posted: Wed Oct 10, 2012 5:30 pm
Hi, occassional block paver here (Brickie) appreciate a bit of advice. Have a job coming up to install a pedestrian walkway about 36 meters long by 1200 wide along the front of a glass fronted commercial building.
Blocks will be Acheston And Glover 200mmx150mm, layed in strecher bond.
Should I lay the blocks running parallel to the building or at right angles? Which will look better to the eye?
The blocks will butt up to a splayed paving unit on the inside and on the outside there will be a concrete kerb.
Just a bit worried because of the length how long uninterrupted joints will look if i lay parallel.
Thanks. (hope this makes sense)
Blocks will be Acheston And Glover 200mmx150mm, layed in strecher bond.
Should I lay the blocks running parallel to the building or at right angles? Which will look better to the eye?
The blocks will butt up to a splayed paving unit on the inside and on the outside there will be a concrete kerb.
Just a bit worried because of the length how long uninterrupted joints will look if i lay parallel.
Thanks. (hope this makes sense)