Posted: Mon Aug 06, 2012 10:29 am
I am about to lay a block paving path, (did the digging yesterday). There will be a another path joining it from the side, but this will not get laid for some time, the edging blocks are going to go round the outside of both paths.
What is a good way to support the blocks until such time as the other path is laid, I was thinking of some 3 by 2 wood fixed in with screw in tent pegs. Is there a better way?
What is a good way to support the blocks until such time as the other path is laid, I was thinking of some 3 by 2 wood fixed in with screw in tent pegs. Is there a better way?