Posted: Mon Aug 01, 2011 11:03 pm
just about to start block paving but the corner but its not quite 90 degrees and if im going to do the herronbone at 90 degress im going to be left with small gaps up the side of the drive which will eventually get larger gaps is that right and how do i get round it thanks