The 80mm Block paving I will be putting down will have single independant flags inset.
The block is 300 x 200 80mm thick. The Flags are 900 x 600 approx 50mm thick.
I am not sure of the best sequence in laying the Flags.
First idea is to use a 900 x 600 former. Lay the blocks as usual and when the former is surrounded, lift out, top up the sand and position the Flag.
Second idea was to use the former and then with three side done top up sand using a temporary restraint on the open side and fit flag. Having the ability to slide it a little and help bed it down. Remove temporary Restraint and continue with blocks.
I will in any case do a test area to see how much higher the Flag needs to be initially to allow for the thicker bed of sand and expected greater settlement.
I don't have any other ideas on this yet, so again, drawing on the experience of those that do, have you a preferred and proven method ?
The block is 300 x 200 80mm thick. The Flags are 900 x 600 approx 50mm thick.
I am not sure of the best sequence in laying the Flags.
First idea is to use a 900 x 600 former. Lay the blocks as usual and when the former is surrounded, lift out, top up the sand and position the Flag.
Second idea was to use the former and then with three side done top up sand using a temporary restraint on the open side and fit flag. Having the ability to slide it a little and help bed it down. Remove temporary Restraint and continue with blocks.
I will in any case do a test area to see how much higher the Flag needs to be initially to allow for the thicker bed of sand and expected greater settlement.
I don't have any other ideas on this yet, so again, drawing on the experience of those that do, have you a preferred and proven method ?