Posted: Sun Sep 05, 2010 5:14 pm
Hello All.
Well I wish I'd found this forum before, I start my project in the morning!
I'm block paving our drive 15m x 4m with a single block edging with the blocks laid
long edges together.
Anyway, first question of probably loads...............
After I've dug out, do I spread the type1 in the fresh dug hole first before I lay the edgings
or do I lay edging course first and then have the type1 tipped in between the edgings, as
I intended having the entrance only 2.4m wide for the first 4m then tipper truck wouldn't
be able to fit in if the edger's were in first.
Regards.
Well I wish I'd found this forum before, I start my project in the morning!
I'm block paving our drive 15m x 4m with a single block edging with the blocks laid
long edges together.
Anyway, first question of probably loads...............
After I've dug out, do I spread the type1 in the fresh dug hole first before I lay the edgings
or do I lay edging course first and then have the type1 tipped in between the edgings, as
I intended having the entrance only 2.4m wide for the first 4m then tipper truck wouldn't
be able to fit in if the edger's were in first.
Regards.