Hi
I'm drawing plans for a planning application to put a drive way into my garden. I'm considering a 6m level parking bay and a ramp of 2.5m long falling 0.54m down to the road. (all 3m wide).
If my sums are correct that's a gradient of 21.6% or 1 in 4.63.
I've mocked up this slope with some canes and it doesn't look too steep but...
an old post to this site refers to 1 in 10 as very steep
a local raod which is very steep is signed as 20%
(but obvioulsly I can still drive up it )
My aim is to keep as much of the garden as possible level but I don't want to end up with realy difficult access. Any thoughts on my preposed gradient would be appreciated.
Also, I'm thinking of concrete with a brushed surface rather than tarmac on the grounds of grip and cost. Am I thinking correct?
Many thanks
Ann
I'm drawing plans for a planning application to put a drive way into my garden. I'm considering a 6m level parking bay and a ramp of 2.5m long falling 0.54m down to the road. (all 3m wide).
If my sums are correct that's a gradient of 21.6% or 1 in 4.63.
I've mocked up this slope with some canes and it doesn't look too steep but...
an old post to this site refers to 1 in 10 as very steep
a local raod which is very steep is signed as 20%
(but obvioulsly I can still drive up it )
My aim is to keep as much of the garden as possible level but I don't want to end up with realy difficult access. Any thoughts on my preposed gradient would be appreciated.
Also, I'm thinking of concrete with a brushed surface rather than tarmac on the grounds of grip and cost. Am I thinking correct?
Many thanks
Ann