Posted: Tue Aug 25, 2009 11:43 pm
OK, so we know the final job should slope away fro mthe house slightly
At the moment I have plain mud which I need to dig up - at the moment it is slightly sloping tTOWARDS the house, so I will obviously need to remove more the further away I go.
Now I know where I want the top of the TYPE 1 to be at the side of my house, so presumably I can use this as a starting guide and then slope away from there.
Question is how would you slope it properly? The only tool I will have is a 1.2m spirit level as opposed to a laser level
Best Idea (thats not on this website) seems to be, knock wooded pegs into the ground, level them all up and then mark the required height with a pencil and then work to that
Question is, should I knock the pegs in now - then dig down into the mud, or shoudl I rmeove loads of mud, knock the pegs in then build my type 1 UP to a mark?
The other option is of course get a long plank of wood and do it that way - but I am not so sure about this method!
Any thoughts?
At the moment I have plain mud which I need to dig up - at the moment it is slightly sloping tTOWARDS the house, so I will obviously need to remove more the further away I go.
Now I know where I want the top of the TYPE 1 to be at the side of my house, so presumably I can use this as a starting guide and then slope away from there.
Question is how would you slope it properly? The only tool I will have is a 1.2m spirit level as opposed to a laser level
Best Idea (thats not on this website) seems to be, knock wooded pegs into the ground, level them all up and then mark the required height with a pencil and then work to that
Question is, should I knock the pegs in now - then dig down into the mud, or shoudl I rmeove loads of mud, knock the pegs in then build my type 1 UP to a mark?
The other option is of course get a long plank of wood and do it that way - but I am not so sure about this method!
Any thoughts?