Hi All, I recently employed a firm to asphalt my drive and in my opinion they have done a poor job. It's approximately 74 square metres and they gave me a price of £2124.00 to supply and lay 60mm of 20mm DBM base course and 30mm of 6mm SMA wearing course on top. The trouble is they took ages to do the job, I have been asking since the summer and they eventually started to come a few weeks ago. When they did the final coat it was pouring down with rain and they didn't lay the top coat in one go like I was expecting. I'm now left with three different sections of asphalt and there's a dip where water gathers by the front door. In fairness to the firm, they have said they are going to come back and resurface the lot when it's warm (whenever that will be, April 2015?).

However, one of my neighbours said I was being a bit fussy and that they would have to have a join somewhere? What do people think on here? Many thanks
Jonathan

Captain Concrete
Posts: 77
Joined: Fri Oct 31, 2014 7:35 am
Location: southeast
Contact:

Post: # 101529Post Captain Concrete

SMA is very hard to hand lay, we always use a hot box if were hand laying it, did they pitch the joint? Some times joints are unavoidable as for the price its about right.
Been in concreting for 22 years

Kuts
Posts: 307
Joined: Sat Mar 26, 2011 5:34 pm
Location: Grrrrrr

Post: # 101531Post Kuts

Can you post a pic?
SMA is pretty tough stuff to lay but should give a far superior finish.......if done correctly.

Swifters
Posts: 5
Joined: Wed Nov 12, 2014 2:40 pm
Location: kent

Post: # 101532Post Swifters

ImageImage

The base course was only 36 sqm by the way. The rest had a pre existing concrete base
Jonathan

Kuts
Posts: 307
Joined: Sat Mar 26, 2011 5:34 pm
Location: Grrrrrr

Post: # 101533Post Kuts

Yeah that's a poor job. i take it they only had a small pickup?
Shouldn't have had a joint in a job that size

Swifters
Posts: 5
Joined: Wed Nov 12, 2014 2:40 pm
Location: kent

Post: # 101534Post Swifters

They had a 7 1/2 ton pick up lorry. I'd have thought they could have done it one hit? Is putting another coat over whats already there going to be ok?
Jonathan

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 101538Post msh paving

That dip is a disgrace, whole job is poor, dont pay them MSH :)
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

Captain Concrete
Posts: 77
Joined: Fri Oct 31, 2014 7:35 am
Location: southeast
Contact:

Post: # 101554Post Captain Concrete

I have seen a hell of a lot worse, when working with SMA by hand at this time of year you can not have a huge working area, due to the fact that it would of gone off significantly by the time you get back to the bit you laid 1st so the joints in my opinion are fine I would off liked to see them get sealed. it also looks like its well compacted except for the open bit at the bottom of the 1st photo. As for the dip it would of been good for that section to be regulated better with the base course but it wont damage the integrity of the drive (as long as its not soft underneath) and SMA is a very good wearing course, maybe a good compromise would be to ask the contractor to pitch the joint and give a discount?
Been in concreting for 22 years

Swifters
Posts: 5
Joined: Wed Nov 12, 2014 2:40 pm
Location: kent

Post: # 101558Post Swifters

Sorry but I'm not sure what people mean by "pitch the joint"? Do you mean seal the joints? Just to clarify, the price was for approximately 36 sqm of 60mm of 20mm DBM base course and 74sqm of 30mm sma. I had compacted down the type one for the 36sqm and the remaining area had an existing concrete base, granted this was not level as in the second picture , but I made them aware of this and they assured me they could level this out. I'm not too concerned over the joints but the dip is quite annoying... I was quoted £2124,00 and I don't really think I've got what I should have?
Jonathan

Captain Concrete
Posts: 77
Joined: Fri Oct 31, 2014 7:35 am
Location: southeast
Contact:

Post: # 101560Post Captain Concrete

Hi, sorry by pitch the joint I mean seal it with some hot tar, see below.
https://www.meonuk.com/media/wysiwyg/Overbanding/Overbanding_Tape.jpg
Been in concreting for 22 years

Swifters
Posts: 5
Joined: Wed Nov 12, 2014 2:40 pm
Location: kent

Post: # 101561Post Swifters

Looks a bit naff though! I don't know if £2124 is a good/fair/bad price for 36sqm of base and 74sqm of sma but I was expecting more for my money...
Jonathan

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 101576Post Dave_L

Shocking job. £28ish inc the VAT a square for that spec, that's at the lower end.......
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 101585Post lutonlagerlout

to me the laying looks not bad but that price is wildly cheap

the dip :~) not good

MSH to say dont pay them is a bit unfair,we have only heard 1 side of the story here


jonathan
I feel you should discuss your concerns with the company and come to some arrangement
I.E pay up 80% and the rest when they sort that dip out

IMHO

LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

neatcon
Posts: 39
Joined: Sat Sep 20, 2014 7:46 am
Location: Ireland

Post: # 101623Post neatcon

Looks more like Marshall asphalt and probably not enough depth, agree the dip is disgraceful.