Under priced driveway

All forms of block paving, brick paving, flexible or rigid, concrete or clays, new construction or renovation
Skinny Digger
Posts: 4
Joined: Fri Dec 05, 2008 11:29 am
Location: Herts

Post: # 33256Post Skinny Digger

I`ve underpriced a driveway.There was more soil to cart away then i thought and it`s cost around £1500 extra.I will still be able to break even.Should i ask the client for more money or just bite the bullet?

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 33257Post Tony McC

Depends on the contract. If you went in at a fixed price, you're legally buggered and will have to rely on the discretion and generosity of spirit of the client, but if you've quoted rates and/or quantities, you are in a much stronger position.
Site Agent - Pavingexpert

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 33268Post GB_Groundworks

like tony said depends how you worded your quote, i.e "excavate to a depth of 150mm and remove 5 cubic metres of spoil" etc leaves you in a much stronger place than "lay 25m2 drive £3k" etc
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

Skinny Digger
Posts: 4
Joined: Fri Dec 05, 2008 11:29 am
Location: Herts

Post: # 33272Post Skinny Digger

Gave her a fixed price.Usually i would have worked the quote at £100 a sqaure metre,that usually covers any extra.The clients payed for quite a bit of the materials already so she might take pity when she sees how much i`ve made.Oh well i better lay some blocks.

Rich H
Posts: 884
Joined: Thu Feb 08, 2007 12:28 pm
Location: Reading

Post: # 33283Post Rich H

We've all done it. Contract aside, it rather depends on the nature of your relationship. From their point of view, they've gone ahead with a certain cost in mind, anything over will be a shock.

I did a large job over the summer - 4 months in total - which was quoted in January on a fixed price basis. By the time it came to fix the sub-contract for the bitmac surfacing of the main driveway the oil price had forced up tarmac by enough to make a nasty dent in my profits. In the circumstances I asked the client to share the pain with me, to which he agreed.

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 33290Post Dave_L

How have you mis-calculated the muck-away?

Any coated work, we cannot hold our prices for any more than 60 days, the price increases have been relentless.

But now the cost of oil etc has dropped - aren't we due a price drop? No chance, everything is going up on 01.01.2009! :angry:
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Skinny Digger
Posts: 4
Joined: Fri Dec 05, 2008 11:29 am
Location: Herts

Post: # 33291Post Skinny Digger

It`s a drive in drive out driveway.One half needed concrete breaking out,the other half was garden and a bit higher.When i quoted i needed the work.I`ve done a patio at the back and i`ve worked for her before.The first quote i gave was the 2nd highest after someone from the Marshalls.The quote i gave was £8300 for 122 sqaure metres.I`ve used type one for the base,but i could have used plainings which would have been cheaper.Anyone ever used them?

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 33292Post seanandruby

Skinny dipper, you will get a brew cabin group slap for mentioning the use of plannings. no, nO, NO!!!
sean

bobbi o
Posts: 481
Joined: Wed Aug 17, 2005 11:55 pm
Location: glasgow

Post: # 33294Post bobbi o

Dave_L wrote:How have you mis-calculated the muck-away?

Any coated work, we cannot hold our prices for any more than 60 days, the price increases have been relentless.

But now the cost of oil etc has dropped - aren't we due a price drop? No chance, everything is going up on 01.01.2009! :angry:
price of bitumen is down by about 120 per tonne,your supplier should pass it on,if you ask!

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 33295Post GB_Groundworks

did i hear road plannings :p haha


Image
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

nick65
Posts: 65
Joined: Fri Nov 28, 2008 12:16 am
Location: OXFORDSHIRE.

Post: # 33298Post nick65

£1500 EXTRA muckaway is an awful lot for the 62m2 you say it came from. An 8 wheeler grab is only around the £200 mark.If your not sure how to cube up a job,theres plenty of info on the main website. Yeeehaa!
"come on lads its dry rain falling now"

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 33315Post lutonlagerlout

if you can still come out of it with wages and materials paid i would swallow it m8,you will know better next time
i found a use for planings this week ,the wall we are building had a grass verge next to it that turned into a complete mudbath,the client had a couple of Metres of planings in his yard so we used these to cover the mud up,and i have to say as a temporary dry base they are ok
but they are not suitable as a load bearing sub base
:)
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 33322Post GB_Groundworks

we use them in field gateways etc to provide a dry hard standing so you can get the gate open and let the horses go etc without slipping over, but most the time unless there is someone working nearby its just easier to get type 1 delivered.
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 33323Post msh paving

round hear tarmac planings are used by a lot off contractors,the local council highways dpt. stockpile and use them for alot of footpath reconstruction work,£13.75 a ton is about the rate, if a planing job is going down its a big fight who will get them local higways wont let them go , i guess its just how it goes in different area's type 1 from mt.sorrel is very expensive cambs. spec limestone is about £14.75 ton which is a little bit bigger stone than type 1 :;):
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 33324Post GB_Groundworks

i pay £200 +vat for 20 ton wagons of type 1 delivered straight from the quarry, although i prefer 20mm-dust easier to rake and grade by hand for top layer.
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com