Posted: Sun Sep 14, 2008 11:03 am
My paving contractor is proposing to lay 5mm Marshalls Drivesett blocks on an inch of coarse sand (25mm?) onto the existing solid concrete driveway. The existing drains will be used for the run-off water from the top of the blocks but he is not adding additional draingae for the sand layer.
Having read the pages here on flexible and rigid construction and using an existing base and all the warnings about drainage, I am worried that we will have problems.
He has been paving for around 13 years and is on the Marshalls Register so I'd like to feel he knows what he's doing and don't feel confident/comfortable in challenging his approach.
Should I be concerned? Should I at least insist on this additional drainage?
Thanks for all the guidance so far. It is much appreciated.
Having read the pages here on flexible and rigid construction and using an existing base and all the warnings about drainage, I am worried that we will have problems.
He has been paving for around 13 years and is on the Marshalls Register so I'd like to feel he knows what he's doing and don't feel confident/comfortable in challenging his approach.
Should I be concerned? Should I at least insist on this additional drainage?
Thanks for all the guidance so far. It is much appreciated.