Posted: Sun Aug 24, 2008 4:16 pm
hi, sorry if this has been covered before.
im reading the site and i dont know whether im supposed to use a membrane/visquine??
please advise me.
i am ripping up my tarmac drive, say 220mm deep.
then adding a type 1 sub base, 120mm deep (gonna put 60mm down then wack that, then another 60mm and wack it again.
then 40mm level screed of grit sand, which i will lay the 60mm blocks on - cover with kiln dried sand - then a final pass with the wacker plate.
(the guy at the builders merchants said block pavers use visquine? is this correct, and if so where do i lay it.
i.e under the sub base, or on top of the sub base & lay grit sand on top of it) do i need it?
im reading the site and i dont know whether im supposed to use a membrane/visquine??
please advise me.
i am ripping up my tarmac drive, say 220mm deep.
then adding a type 1 sub base, 120mm deep (gonna put 60mm down then wack that, then another 60mm and wack it again.
then 40mm level screed of grit sand, which i will lay the 60mm blocks on - cover with kiln dried sand - then a final pass with the wacker plate.
(the guy at the builders merchants said block pavers use visquine? is this correct, and if so where do i lay it.
i.e under the sub base, or on top of the sub base & lay grit sand on top of it) do i need it?