Posted: Mon Jul 21, 2008 6:32 pm
Marathan job finished 2 weeks ago ... drive sanded & wacked.
Looked good ... but as soon as it rains, sand is washing out of joints at alarming rate.
each time we drive a car off the drive you can see a clear pattern of where car was .. as rain had dropped onto paviors and washed out an outline of the car.
I bought expensive clay paviors (spaced by moluded nibs) joints are correct width ... but sand is imply not staying put.
I can't keep throwing bags of jointing sand at it ... I have sand dunes forming at the kerbside
There is a 10m x 8m flat area ... just minimum grade, and then a similar size area on a slope to kerb.
Yesterday for example, washed car, and then looked at drive around car sand had been washed out to a depth of about 15mm on each joint ... and that is not hosing or pressure washing the paviors - just run off from the car.
Do I need to apply some sort of stabilizer ?
Job has full sub-base, Terram, sharp sand and weeks of prep work. All edges are restrained.
Looked good ... but as soon as it rains, sand is washing out of joints at alarming rate.
each time we drive a car off the drive you can see a clear pattern of where car was .. as rain had dropped onto paviors and washed out an outline of the car.
I bought expensive clay paviors (spaced by moluded nibs) joints are correct width ... but sand is imply not staying put.
I can't keep throwing bags of jointing sand at it ... I have sand dunes forming at the kerbside
There is a 10m x 8m flat area ... just minimum grade, and then a similar size area on a slope to kerb.
Yesterday for example, washed car, and then looked at drive around car sand had been washed out to a depth of about 15mm on each joint ... and that is not hosing or pressure washing the paviors - just run off from the car.
Do I need to apply some sort of stabilizer ?
Job has full sub-base, Terram, sharp sand and weeks of prep work. All edges are restrained.