Posted: Thu Jul 17, 2008 9:30 pm
I am constructing an area of block paving in my drive and I plan to use Terram BuildA followed by 150mm of MOT1, 40mm sharp sand and 60mm Marshall Keyblocks.
The man has just been with the digger and dug down to formation level. However the contour of the excavated area was not quite right and I have removed spoil from the edges and other high spots and used this to help level out the rest of the area.
My question is: Do I need to use a 'Wacker' on the sub-grade in the area that I have back-filled or would a general trampling over the area be sufficient prior to laying the Terram? I had not planned to hire the Wacker until I had laid and levelled the sub-base but I can higher it earlier if necessary.
I have to confess that I do not recall seeing any reference to Wacking sub-grades on either this site or in Tony's book so perhaps I am worrying over nothing.
Many thanks in anticipation.
Mike
The man has just been with the digger and dug down to formation level. However the contour of the excavated area was not quite right and I have removed spoil from the edges and other high spots and used this to help level out the rest of the area.
My question is: Do I need to use a 'Wacker' on the sub-grade in the area that I have back-filled or would a general trampling over the area be sufficient prior to laying the Terram? I had not planned to hire the Wacker until I had laid and levelled the sub-base but I can higher it earlier if necessary.
I have to confess that I do not recall seeing any reference to Wacking sub-grades on either this site or in Tony's book so perhaps I am worrying over nothing.
Many thanks in anticipation.
Mike