Sub-base question - Two layers or one layer

All forms of block paving, brick paving, flexible or rigid, concrete or clays, new construction or renovation
Post Reply
rushd
Posts: 41
Joined: Thu May 08, 2008 2:20 pm
Location: essex

Post: # 28819Post rushd

Hopefully a break in the wet weather this weekend, so I'm intending to press on with the project. I have kept tarps over the ground to try and keep most of the water off... the swimming pool looks good!

My question is :

Now that I have edged with soldiers on all 4 sides, I have a narrow strip to pave that's effectively 6mx1m, so I have a relatively small/medium sized Wackerâ„¢ plate compactor so that I can move it about within the edgings.

The foundation(?) level varies in some places due to soft clay which I have removed, so the overall depth varies between 120mm - 170mm. I am using Type 1.

Given that Tony says smaller plates are not really up to the job of sub-base compaction, would anyone recommend doing it in two layers?

is it better to get the first layer down, compact 'fully' before adding second layer to 'bedding' level?
or just chuck the whole lot in and wack it til your arms ache?

any advice appreciated
Darren

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 28832Post Tony McC

You could do, but bear in mind the twice-the-minimum-particle size recommendation, so each layer should be not less than 80mm or so, as far as possible.
Site Agent - Pavingexpert

rushd
Posts: 41
Joined: Thu May 08, 2008 2:20 pm
Location: essex

Post: # 28850Post rushd

hmmm ok. i have more thinking to do...

cheers
Darren

matt h
Posts: 607
Joined: Mon Jul 09, 2007 11:14 pm
Location: gosport

Post: # 28877Post matt h

more wackering morelike!:D
general builder, maintenance engineer, gas and plumbing installations, extensions etc