Posted: Fri Aug 01, 2014 10:29 am
Hi,
I have had a stone covered driveway that I have removed the stones from to find half is concrete and half is type 1. Its all very stable as its had cars parked on it for years.
I want to lay a gravel bonded driveway but need a suitable base for this to be laid on.
I know that I can pour new concrete over the existing concrete with a 1 inch layer but am unsure about the MOT. The layer of the MOT is about 1 inch below the concrete slab.
The area of the driveway is 9 x 9 (so 81m2)
I have seen a way of putting resin bonded over this mix of layers and this is an example:
Sure set
However I am considering a concrete pour over the whole area so it will be 1 inch over the concrete and 2 inches over the type1 and intend to use a steel fiber re-inforced 100N/m concrete formulation (UHPC). Given this is 5x the strength of a standard driveway concrete that is normally only laid at 5 inches thick and given the sublayer is so mature AND given that there will be a topcoat of a resin bonded gravel I would have thought this would be more than acceptable.
BUT obviously I'm on here to ask if there is something I am missing?
I have had a stone covered driveway that I have removed the stones from to find half is concrete and half is type 1. Its all very stable as its had cars parked on it for years.
I want to lay a gravel bonded driveway but need a suitable base for this to be laid on.
I know that I can pour new concrete over the existing concrete with a 1 inch layer but am unsure about the MOT. The layer of the MOT is about 1 inch below the concrete slab.
The area of the driveway is 9 x 9 (so 81m2)
I have seen a way of putting resin bonded over this mix of layers and this is an example:
Sure set
However I am considering a concrete pour over the whole area so it will be 1 inch over the concrete and 2 inches over the type1 and intend to use a steel fiber re-inforced 100N/m concrete formulation (UHPC). Given this is 5x the strength of a standard driveway concrete that is normally only laid at 5 inches thick and given the sublayer is so mature AND given that there will be a topcoat of a resin bonded gravel I would have thought this would be more than acceptable.
BUT obviously I'm on here to ask if there is something I am missing?