Page 1 of 1

Posted: Sat Sep 29, 2007 5:41 pm
by gregkettle
Im laying 90m2 of block paving on drive way. how do i know when ive laid and compacted 100mm of type 1 evenly across the drive, before screeding with sand? thanks

Posted: Sat Sep 29, 2007 7:24 pm
by seanandruby
pull a line across from pins, or , stakes at finished levels and dip down to required height of mot. level plus, or minus 10ml. then compact to refusal. all this info is on the main index.