Posted: Wed Sep 05, 2007 3:45 pm
I hope someone can help me....
I had a estimate for a new block paved driveway. The contractor has told me they will dig down 8 inches. This will be made up of 4 inches of crushed concrete, 2 inches of sand and the final 2 inches being the block paving. After reading through these forums 4 inches or 100mm of sub base seems to be the minimum required and 6 inches is preferrable. The ground below is clay. Would you advise that I ask him to dig down an additional 2 inches? I've also seen on these forums that Type 1 is a better product than crushed concrete. After checking a few websites though there seems to be 2 types of Type 1, limestone or crushed concrete. Should I be asking for Type 1 limestone option?
Thanks
I had a estimate for a new block paved driveway. The contractor has told me they will dig down 8 inches. This will be made up of 4 inches of crushed concrete, 2 inches of sand and the final 2 inches being the block paving. After reading through these forums 4 inches or 100mm of sub base seems to be the minimum required and 6 inches is preferrable. The ground below is clay. Would you advise that I ask him to dig down an additional 2 inches? I've also seen on these forums that Type 1 is a better product than crushed concrete. After checking a few websites though there seems to be 2 types of Type 1, limestone or crushed concrete. Should I be asking for Type 1 limestone option?
Thanks