Page 1 of 1

Posted: Fri Jul 27, 2007 5:07 pm
by pollitt1
Do i put the membrane sheet down on the soil before the sub-base or do i just lay the subbase on soil and then put the membrane inbetween the sub and sand?

Posted: Fri Jul 27, 2007 7:19 pm
by Tony McC
Read the website

Posted: Fri Jul 27, 2007 8:04 pm
by lutonlagerlout
thats the polite way of saying RTFM!
lol
LLL