Posted: Fri Jul 27, 2007 5:07 pm
Do i put the membrane sheet down on the soil before the sub-base or do i just lay the subbase on soil and then put the membrane inbetween the sub and sand?
Paving, Drainage and Hard-landscaping in Britain and Ireland
https://ext.pavingexpert.com/brewcabin/
https://ext.pavingexpert.com/brewcabin/viewtopic.php?t=12161