Posted: Mon Aug 28, 2006 8:32 am
by seanandruby
ive been advised to start at the bottom and work upwards. at the bottom my drive is angled. so do i transfer the house line to the bottom of the drive and trim the blocks to suit when i reach the top,or, come off square with the house and work down? setting it out today so would appreciate answer.

Posted: Mon Aug 28, 2006 10:21 am
by bobhughes
This has been covered before and I think the consensus was to keep square with the house.

Posted: Mon Aug 28, 2006 5:18 pm
by seanandruby
must of missed topic as i work out of town. any idea when it was covered?
thanks m8

Posted: Mon Aug 28, 2006 6:10 pm
by lutonlagerlout
yes if you measure at 90 degree angles from the house to the edge then string a parallel line to work your first block off
btw i always allow 1005 mm for 5 blocks a 1000 is too tight
cheers tony :)

Posted: Tue Aug 29, 2006 9:05 pm
by seanandruby
thanks for that. it all comes back im just a bit ring rusty.