I have a 85 sq metres which I need to excavate to a depth of 200mm in order to then lay sub-base, bedding sand and blocks.
I'm assuming that I should excavate this lot into skips but I have never used skip companies before.
What size do skips come in and what size will I need?
Also, how long are they generally left at the property for as I don't really have room for one for longer than is needed (1 day to excavate sound about right?)