Posted: Tue Apr 11, 2006 11:14 am
I am in the process of constructing a set of 6 steps using 200 x 100 kerb units and 65mm blocks . I have set the kerb units and the blocks for the treads onto concrete. Should I use sand for filling the joints of the kerb units or is this likely to wash out.
Thanks
Thanks