OK, I am a female novice so be easy on me. I have a freind that is helping me do my drive which is around 55sqmt. He has dug the concrete drive out to a level of 200mm. We put a geo-membrane down and then 11 tonnes of MOT. The problem is, he has wacked it down and it is really firm now but in places it is higher than other places. I know the problem is my drive as it is on a gradient going towards the house. I am getting the grit sand delivered tomorrow but I am not happy with the un even level. My freind wants to proceed as it is as he thinks when we put the sand down the level will correct itself. Obviuosly I think that this a receipe for disaster as I beleive your sub-base is the part that needs to be the most important part of the whole project. Please help as I need him to get this right. Thanks