Posted: Wed Nov 09, 2005 7:38 pm
Tony
Am well on the way towards laying 60mm concrete paviors on a fairly steep driveway with a generous cross fall. Your excellent site has answered all my queries to date bar 1. Many thanks. I have reached the bedding sand stage (intend to use your "full" precompaction method) and my unanswered concern is about the effects of rain on: ??? The sand bed if drenched before being covered with blocks.Pre or post screeding? ??? Water ingress through the leading edge. Intend laying uphill? ??? Scouring effects on the bedding sand via unfilled joints. Many thanks in anticipation of your reply and again thanks for your splendid site.
Am well on the way towards laying 60mm concrete paviors on a fairly steep driveway with a generous cross fall. Your excellent site has answered all my queries to date bar 1. Many thanks. I have reached the bedding sand stage (intend to use your "full" precompaction method) and my unanswered concern is about the effects of rain on: ??? The sand bed if drenched before being covered with blocks.Pre or post screeding? ??? Water ingress through the leading edge. Intend laying uphill? ??? Scouring effects on the bedding sand via unfilled joints. Many thanks in anticipation of your reply and again thanks for your splendid site.