Posted: Thu Jul 15, 2004 12:00 am
well the marshall's contractor is is here for the 3rd go, at laying the edge course correctly, and nearly as per the refernces on this site.
he has laid the soldiers on a concrete mix (which is one some soil) and the mix is fairly dry, he intends to haunch up the side of the soldier bricks with a wetter mix tomorrow.
is that okay, to build the haunch with 2 mixes of concrete in 2 days, i am, worried about the bonding and the strength of the haunching.
also, he has laid some haunch down with no soldiers, presume he will lay the soldiers down on the set concrete tomorrow