Posted: Wed Jun 23, 2004 11:17 pm
Hello,
I'm a DIY'er about to embark on a 'small ish' (50sqM) Block paving driveway (medium/heavy use) project. We have excavated to 350mm below the DPC and found pretty good quality clean sand. The Sub base 100mm of MOT1 is about to be put down (over a geo textile). Given we found sand it is this good or bad thing? I was considering compacting this first before puttting down the geotextile and then the MOT. Is this over/underkill.
Any replies gratefully received.
Love Lucy
I'm a DIY'er about to embark on a 'small ish' (50sqM) Block paving driveway (medium/heavy use) project. We have excavated to 350mm below the DPC and found pretty good quality clean sand. The Sub base 100mm of MOT1 is about to be put down (over a geo textile). Given we found sand it is this good or bad thing? I was considering compacting this first before puttting down the geotextile and then the MOT. Is this over/underkill.
Any replies gratefully received.
Love Lucy