Hi, no matter how many times i read the info on scredding bedding sand for block paving, it doesn't seem to click.
I have already started a project, a driveway. i have already laid the hardcore base and laid paviours around the perimeter of the site, and haunched with concrete. all i need to do is figure out the scredding process.
I have seen that you prefer the pre- compacted method but i have been told, what you call the hard way screeding without compaction.
The method i have been told is to lay sand within the inside of the edge courses and set up a notched timber method where you screed the sand to a level where the blocks lie 10mm higher than the required level, but when all blocks are laid, compact the lot down to the right level.
However what i don't understand is if you lay sand within the edging courses to a level higher than the required, lets say, 10mm below the finished level, and whack the lot, ie the pre compacted method, then screed off to the required level, so that the blocks lie above the required level. When you come to compact the blocks they won't go down as the sand is compact underneath.
This is my worry.
Hope you can help
Thanks
Liam James
I have already started a project, a driveway. i have already laid the hardcore base and laid paviours around the perimeter of the site, and haunched with concrete. all i need to do is figure out the scredding process.
I have seen that you prefer the pre- compacted method but i have been told, what you call the hard way screeding without compaction.
The method i have been told is to lay sand within the inside of the edge courses and set up a notched timber method where you screed the sand to a level where the blocks lie 10mm higher than the required level, but when all blocks are laid, compact the lot down to the right level.
However what i don't understand is if you lay sand within the edging courses to a level higher than the required, lets say, 10mm below the finished level, and whack the lot, ie the pre compacted method, then screed off to the required level, so that the blocks lie above the required level. When you come to compact the blocks they won't go down as the sand is compact underneath.
This is my worry.
Hope you can help
Thanks
Liam James